News

Hiring of HEMM for Removal of Overburden (936.72 Lakh CuM) and Extraction & Transportation of coal (53.00 Lakh Tes) from Tirap OCP of Tirap Colliery at NEC, Margherita for a period of 10 years (1 year for development and 9 years for Production)

Click to Download

Hiring of HEMM for Removal of Overburden (936.72 Lakh CuM) and Extraction & Transportation of coal (53.00 Lakh Tes) from Tirap OCP of Tirap Colliery at NEC, Margherita for a period of 10 years (1 year for development and 9 years for Production) Read More »

Drawing & Analysis of Ambient Air/Heavy Metal//Effluent Water/Drinking Water/Noise Level samples and Ground Water Monitoring by Environmental laboratories approved/recognised by PCB, Assam/CPCB/ MoEF&CC with valid ISO 9001 and OHSAS 18001/ISO 45001

Click to Download

Drawing & Analysis of Ambient Air/Heavy Metal//Effluent Water/Drinking Water/Noise Level samples and Ground Water Monitoring by Environmental laboratories approved/recognised by PCB, Assam/CPCB/ MoEF&CC with valid ISO 9001 and OHSAS 18001/ISO 45001 Read More »

Scroll to Top
Scroll to Top